Drilling Intelligence
4.5-day reduction per well. 15% ROP improvement.Automated and advisory-driven drilling technologies across the fleet.
4.5-day reduction per well. 15% ROP improvement.Automated and advisory-driven drilling technologies across the fleet.
650+ digitally enabled stages. 20 pumping hours and 14 stages in a single day. 56% completion time reduction.
Reducing emissions and freshwater demand through intelligent pump automation and integrated water management.
Over 500 days of flow-to-clean across Diyab, Huwaila and Falaha, overcoming high-pressure, high-temperature and high-H₂S challenges
4.5-day reduction per well. 15% ROP improvement.Automated and advisory-driven drilling technologies across the fleet.
650+ digitally enabled stages. 20 pumping hours and 14 stages in a single day. 56% completion time reduction.
Automated wellsite frac connection system. Reduces manual intervention and crew exposure.
Reducing emissions and freshwater demand through intelligent pump automation and integrated water management.
Over 500 days of flow-to-clean across Diyab, Huwaila and Falaha, overcoming high-pressure, high-temperature and high-H₂S challenges
Cuts time on location and optimizes clean-to-flow performance.